Corporate

Corporate

Fact Sheet

Table of Content

Features

Fact Sheet

AIRPORT LOCATION
16 km / 10 miles from city centre
RUNWAYS
11L-29R (4400m / 45 Meter Width)
11R-29L (4430m / 60 Meter Width)
10-28 (3813 m / 45 m)
09-27 (2816 m / 45 m)
TOTAL PASSENGER TRAFFIC (2025-26)
7,36,73,708
TOTAL CARGO MOVEMENT (2025-26)
10,03,306
IATA / ICAO CODE
DEL / VIDP
TOTAL TERMINALS
4,56,183
Elevated Cross Taxiway
2.1 KM Long / 202 Meter Wide
55K Tons of CO2 emission reduction annually

Table of Content

RYW
09
TORA
2816M
TODA
2816M
ASDA
2816M
LDA
2816M
ILS Category
Cat-I
RYW
27
TORA
2816M
TODA
2816M
ASDA
2816M
LDA
2665M
ILS Category
Cat-I
RYW
10
TORA
3813M
TODA
3813M
ASDA
3813M
LDA
3813M
ILS Category
Cat-I
RYW
28
TORA
3813M
TODA
3813M
ASDA
3813M
LDA
3813M
ILS Category
Cat-III (RVR 50m)
RYW
11R
TORA
4110M
TODA
4110M
ASDA
4430M
LDA
3465M
ILS Category
Cat-III (RVR 50m)
RYW
29L
TORA
4430M
TODA
4430M
ASDA
4430M
LDA
2970M
ILS Category
Cat-III (RVR 50m)
RYW
11L
TORA
3670M
TODA
3670M
ASDA
4400M
LDA
3000M
ILS Category
Cat-III (RVR 50m)
RYW
29R
TORA
4170M
TODA
4170M
ASDA
4400M
LDA
3440M
ILS Category
Cat-III (RVR 50m)

Terminal 3 : Salient Features

  • Integrated Terminal – International and Domestic.
  • 45 million passengers per annum capacity.
  • 5.8 million sq ft. area.
  • 9 level passenger terminal building and 2 piers each 1.2 km long.
  • In-line Baggage Handling System with capacity to handle 13,000 bags per hour.
  • 7 Common check-in islands - 220 check-in counters and 14 Self Baggage Drop.
  • 206 Immigration counters (100 Outbound and 106 Inbound Immigration counters).
  • 78 Passenger Boarding Bridges (including 3 Passenger Boarding Bridges for A380 or similar sized aircraft).
  • 14 Baggage reclaim belts including 2 belts for Out of Gauge (OOG) bags.
  • 6.7 million sq ft. of apron area.
  • 100 room Transit Hotel for Domestic and International passengers (68 rooms for domestic transit and 32 rooms for international transit).
  • 96 automatic travelators /walkways (Longest one being 118 mts in length).
  • Over 20,000 sq mters. of retail space.
  • Multi Level Car Park to accommodate 4300 cars.
  • 7 MLD Water and 10 MLD Sewage Treatment Plant (total quantity for entire airport, treatment plant inside airport premises only).

Construction Time

RYW
Changi Airport – Singapore (T3)
Capacity
22 Million
Time
76 months
RYW
Heathrow T5 – London, UK
Capacity
25 Million
Time
60 months
RYW
Beijing Airport New terminal for Olympics – T3, China
Capacity
45 Million
Time
60 months
RYW
Delhi Airport – T3, New Delhi, India
Capacity
45 Million
Time
37 months
Media Contact:
Mr. Subhendu Ray,
Senior Lead, Corporate Communications,
GMR Group

Stay Connected

InstagramTwitterLinkedinYoutubeFacebook

Subscribe to our special offers

Delhi Airport, connecting to over 150 destinations, is ranked as the top 9th busiest airport in the world. A preferred transit hub connecting millions of passengers globally, DEL is awarded as the best airport in India and South Asia by Skytrax for the 8th year in a row. Explore seamless travel, modern amenities and the vibrant essence of Delhi, all at one destination.

Secured by

delhi-airport